PJM Grid · Capacity

How much load fits? It depends on the ceiling.

Hourly replay is useful for timing and sensitivity. It cannot turn an assumed supply ceiling into an official reliability threshold.

Current facts as of 22 July 2026 · Model uses EIA-930 years 2016–2024

There is no defensible universal “break point.”

With the explicitly assumed 170 GW normal-conditions ceiling, the first hourly crossing occurs between 17 and 25 GW of flat added load across nine weather years. Change the ceiling and the range changes one-for-one.

Do not read this as LOLE. The replay has no probabilistic generator-outage model, no transmission network, and no PJM capacity-accreditation logic. It is a transparent chronology screen.

Every replay year crosses the illustrative ceiling.

At 30 GW of flat incremental load, the model records 2097 shortage-screen hours depending on the weather year.

2016
72 hours
2017
22 hours
2018
75 hours
2019
36 hours
2020
40 hours
2021
68 hours
2022
44 hours
2023
20 hours
2024
97 hours

Year-by-year trace.

Weather yearObserved peak after QCFirst integer-GW crossing30 GW events30 GW max gap
2016152.9 GW18 GW1512.9 GW
2017146.6 GW24 GW46.6 GW
2018151.5 GW19 GW1511.5 GW
2019152.3 GW18 GW812.3 GW
2020145.4 GW25 GW115.4 GW
2021149.6 GW21 GW159.6 GW
2022148.5 GW22 GW108.5 GW
2023147.6 GW23 GW47.6 GW
2024153.1 GW17 GW1913.1 GW

The source snapshot is unchanged. 10 one-hour values are interpolated in memory: six isolated anomalies and four missing values, all listed in results.json.

The assumed ceiling moves the answer almost one-for-one.

Scenario ceilingFirst-crossing rangeMedian crossing
160 GW715 GW11.0 GW
165 GW1220 GW16.0 GW
170 GW1725 GW21.0 GW
175 GW2230 GW26.0 GW
180 GW2735 GW31.0 GW

These are scenario ceilings, not PJM ICAP or UCAP values. The table exists to keep the model's most important assumption visible.

The capacity auction made higher-fidelity “headroom hunting” unnecessary.

PJM's current procurement is already 6,831 MW UCAP below its reliability requirement. The hourly model still matters—but for designing conditions and fallbacks, not for declaring spare accredited capacity.